DHA Multan

The Company has delivered following Project

Construction of Pumping Station-2

The scope included as follows:

Toughest Project of DHA Multan
Construction of underground Tank
40 FT deep excavation in Sandy Strata
40 FT high RCC walls
Mechanical Works
Backfilling
Construction of Pumping Station-2

Construction of 2 RBs (Retention Basins)

The scope included as follows:

Excavation in Sandy Strata
40 FT Deep Drilling
40 FT HDPE Pipe fixing
Construction of 2 RBs (Retention Basins)
Construction of 2 RBs (Retention Basins)

Additional Scope

Blocks fixing
RIPRAP fixing
Boulders fixing
RCC Works