Construction of Pumping Station-2
The scope included as follows:
Toughest Project of DHA Multan
Construction of underground Tank
40 FT deep excavation in Sandy Strata
40 FT high RCC walls
Mechanical Works
Backfilling

Construction of 2 RBs (Retention Basins)
The scope included as follows:
Excavation in Sandy Strata
40 FT Deep Drilling
40 FT HDPE Pipe fixing


Additional Scope
Blocks fixing
RIPRAP fixing
Boulders fixing
RCC Works